COMMIT FIELD — STYLIZED
FIELD NOTES
2026.07.20 — asymmetric capacitor thrust rig, v2
2026.05.30 — literature audit: most of it evaporates on contact
An investigation into the claims of Thomas Townsend Brown. Replicate first; explain never.
COMMIT FIELD — STYLIZED
2026.07.20 — asymmetric capacitor thrust rig, v2
2026.05.30 — literature audit: most of it evaporates on contact